Wind River Estates – 2008
Storm Drain

Wind River Estates – 2008



Site work for a new residential subdivision in Shelley, Idaho. Scope of work included, excavated 18,518 cu. yards of dirt from roadway, placed 4,500 cu. yards of pit run, placed 1,500 tons of ¾” road base on roadway, and placed 900 tons of asphalt on road. Installed 2,690 lineal feet of curb and gutter, installed 120 lineal feet of 12” storm drain, installed 830 lineal feet of 18” storm drain, installed 375 lineal feet of 24” storm drain, installed 170 lineal feet of 36” corrugated metal culvert, and installed 2 – 8 foot X 12 foot French drains. ECI also installed 5 storm sewer manholes, 850 lineal feet of 8” SDR 35 sewer line, 13 sewer services, 5 sanitary sewer manholes and 1 pour-in-place manhole. Installed 900 lineal feet of C900 water line, 13 water services, and completed 4 water main line hot taps.  Contract Amount:  $389,084.70