Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Teton Lakes Golf Course – 2008
Specialty

Teton Lakes Golf Course – 2008



ECI added an additional 9 holes to the Teton Lakes Golf Course. Scope of work included all work, shaping, greens and bunker construction, seeding and earth work which was all performed in-house.  Installed 290 Toro 670 irrigation heads with wire, 7 controllers, 360’ of 14” 905, irrigation pipe, 1,000’ of 12” SDR 21 irrigation pipe, 1,000’ of 10” SDR 21 irrigation pipe, 1,700’ of 8”  SDR 21 irrigation pipe, 2,000’ of 6” SDR 21 irrigation pipe, 1,400’ of 4” SDR 21 irrigation pipe, 860’ of 3” SDR 21 irrigation pipe, 1,500’ of 3” bell end lateral irrigation pipe, and 20,200’ of 2” bell end lateral irrigation pipe. All valves, drains and air relief valves for system, 2-200hp and 1-20hp irrigation pumps, including the Pump House and Wet Well. ECI moved and placed 155,000 cu.yds. of dirt and shaped entire golf course and built all 9 tees and all greens. Finished and planted 52 acres of fairways, roughs, tees and greens. ECI screened 3500 tons of material onsite for green sand. This project was GPS modeled and built using Trimble GPS Technology.  Contract Amount:  $823,365.00

http://www.cybergolf.com/golf_news/third_nine_in_idaho_being_built_on_a_budget