Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Shoshoni Plains Phases II thru IVB – 2006-2007
Developments

Shoshoni Plains Phases II thru IVB – 2006-2007



New subdivision in Driggs, Idaho.  Scope of work included 24,492 cu.yds. roadway and path excavation, 14,148 cu.yds. roadway and path structural fill and 13,531 cu.yds. roadway and path crushed aggregate. 1 – 10’ wide, 3’6” high 150’ long multiplate arched bridge, 1 – 10’ wide, 3’6” high 70’ long multiplate arched bridge, and 1 – 10’ wide, 3’6” high 40’ long multiplate arched bridge. 4,500 cu.yds. compacted fill on lots. 10,879 lineal feet of 8” ductile iron water line, 8,917 lineal feet of 8” SDR 35 sewer line, 41 sanitary sewer manholes, 119 sewer connections, 119 water connections, 10,300 lineal feet of utility trench and backfill, 19,873 lineal feet of curb, 15,248 lineal feet of sidewalk, 30,582 sq. yds. Of  2” thick asphalt, 3 acres of shaped nature parks, and Soccer field.  Contract Amount:   $3,507,744.00