Rexburg Marriot Springhill Suites – 2008-2009
Developments

Rexburg Marriot Springhill Suites – 2008-2009



Installation of 360 LF 12” Sewer Main, 360 LF 8” Sewer Main, 1100 LF 12” ductile water line, 1100 LF 8” C-900 water line, and 60 LF 6” and 4” C-900 water line. Installation of 8”,6”, and 4” valves and 2 fire hydrants. Installation of 740 LF 12” storm drain, 40 LF 10” storm drain, 300 LF 6” roof drain, along with 5 infiltration basins, 5 12” storm drain catch basins and 2 detention ponds. Prep and sidewalk installation along with sub-grade excavation for parking lot of 86,400 SF, place 1500 CY ¾ road base, and 900 TN asphalt. Construction of 17,500 SF concrete building pad, along with 1900 LF of concrete footing and walls.  Contract Amount:  $670,634