Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Reserve at Badger Creek – 2007
Developments

Reserve at Badger Creek – 2007



Site work for a new residential subdivision in Tetonia, Idaho.  Scope of work included excavate 18,620 cu. yards of material from  roadway, fill 17,350 cu. yards of material into dug way for roadway and place 3,244 cu. yards of pit run on roadway, 1,946 cu. yards of ¾” road base on roadway. Install 90 lineal feet of corrugated metal culvert, 100 lineal feet of 6” fire suppression line, 2 fire hydrants, and excavate 2,160 cu. yards of material for 2 fire suppression ponds. Install geotextile fabric and 40 mil liners in fire suppression ponds.  Contract Amount: $504,847.00