Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Repair Failing Sewer – Chiricahua National Monument – 2010-2011
Utilities - Sewer

Repair Failing Sewer – Chiricahua National Monument – 2010-2011



Edstrom Construction completed the repairs of a failing sewer system at the Chiricahua National Monument outside of Wilcox, AZ.  The project included: demolition of the existing system,  slip lining parts existing sewer lines, working in environmentally sensitive areas, construction of several leach fields, installation of 2 lift stations and septic tanks(5,000 and 10,000 gal cement), and new sewer line installation.  Removal and replace existing park service fencing.  Installation services in existing campsites.  Contract Amt:  $1,479,123