Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Mack’s Inn Wastewater Treatment Plant Improvements
Current Jobs

Mack’s Inn Wastewater Treatment Plant Improvements


Mack’s Inn Wastewater Treatment Plant Improvements

ECI was awarded the contract from Macks Inn this year. Work includes improving the existing waste water treatment facility by replacing some weir and slide gates, removing the existing liner and disposing of the bio solids, Modifying the existing chlorine system, installation of recycled water piping and  a recycled water irrigation pumping system. The project included clearing approximately 80 acres of forested land for a new land application pivot system.