Lyman Creek Water System, Bozeman, MT – 2009
Treatment Facilities

Lyman Creek Water System, Bozeman, MT – 2009



Construction of a spring collection system which includes, installation of 308 LF of 12” of HDPE pipe, 32 LF of 36” CMP, and an overflow measurement vault. Construction of upgraded treatment and storage components including, installation of upsized piping, sodium hypochlorite disinfection, hydrofloursilic acid (fluoride), and propane heat in the Inlet Control Building, and level monitoring in the storage reservoir.  Upsized piping in the Inlet control Building includes new 12” piping with fittings, a pressure reduction valve, a flow control valve with metering, combination air valves and appurtenances. Chemical system improvements include new storage tanks, chemical feed pumps, piping, fittings, valves and injection assemblies. Level monitoring improvements to the reservoir include a level transducer, a festoon system, cable, junction boxes, and conduit.   Contract Amount:  $361,944