Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Henderson Apartments – 2010-2011
Developments

Henderson Apartments – 2010-2011



Set up SWWP. Completed all mass excavation of hard rock,  21,560 CY. Utilities installed include 200 LF of 6” SDR Pipe, 940 LF of 6”  water, 900 LF of 8” Water, including water services and 2 fire hydrants. Installation of 1020 LF of 12” Storm Drain, and trenching, bedding, and backfill for electrical conduits, 1800 LF. Finish Grade 150,000 SF and place 95,600 SF of ¾ road base.  38,800 SF concrete prep for sidewalk and flatwork, along wih 2062 LF of curb prep and backfill and place topsoil in landscape area, 1000 CY. Asphalt paving parking lot.  Contract Amount:  $854,877