Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
City of Rexburg – 2008
Storm Drain

City of Rexburg – 2008



Rebuild of Main Street from 3rd east to the hospital.  Scope of work included excavating and remove 2,050 cu. yards of asphalt. Remove and replace 1 – 48” manhole. Install 40 lineal feet of 8” SDR 35 sewer and grout 90 feet of 36” storm drain. Install 4,400 sq. yards of geotextile fabric, place 1,450 cu. yards of pit run, 425 cu. yards of ¾” road base, and 610 tons of asphalt. Remove and replace 190 lineal feet of curb and gutter and install 1,050 lineal feet of landscape curbing. Place 475 cu. yards of topsoil, design and install sprinkler system, install 11 pine trees, and 1,625 sq. yards of sod.  Contract Amount: $182,342.00