Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Chisos Basin Wastewater Treatment Plant – Big Bend NP – 2010-2011
Treatment Facilities

Chisos Basin Wastewater Treatment Plant – Big Bend NP – 2010-2011



ECI constructed a new sewer treatment plant at Big Bend National Park in the Chisos Basin in south Texas.  The project included removing sludge from existing ponds to utilize for new plant site, underground utilities, construction of access road and site work, all structures and buildings, blower building, facility piping, lift station, treatment plant, and all site concrete and asphalt.  We managed subcontracts for surveying, electrical and mechanical trades and constructed the remaining items in house.  Contract Amount:  $3,308.722.54