Warning: Declaration of description_walker::start_el(&$output, $item, $depth, $args) should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/camero68/public_html/wp-content/themes/fuzio/functions.php on line 0

Warning: Declaration of DCB_break::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0

Warning: Declaration of DCB_share_bar::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/camero68/public_html/wp-content/themes/fuzio/functions/widgets.php on line 0
Birch Creek – 2008
Developments

Birch Creek – 2008



ECI constructed a new subdivision 20 miles east of Idaho Falls. Scope of work included excavating and backfilling 12 miles of trench for power and communications, placing 46,000 Cubic yards of structural fill, placing 14,000 Cubic Yards of ¾ Gravel Road base, and building 8.5 miles of 24’ wide roadway. There was extensive soft spot repair, along with installing 1,700 lineal feet of 6” waterline and 390 lineal feet of corrugated metal culvert.  Contract Amount: $1,420,333.00