BIP 40 LLC is developing a 114.72 acre site into an RV park with 6 acre +/- boat, RV, utility storage area and a 4.5 acre +/- mini storage area. The plan calls for 708 RV sites (sized 30’x70′) and five mobile home sites (sized 110’x50′). We are responsible for all sewer and water utilities… Read More
This is a waste water treatment facility that we are upgrading for the City of Soda Springs to meet new EPA requirements. We are adding a new plant to be constructed around an existing plant still in operation. The new building will be 20,000 square feet with 21 foot concrete walls. We started with demolition of… Read More
Remodeled the administration building for the National Park Service to include; removing and replacing HVAC, upgrading electrical, drywall repair, remove and replace ceiling tiles, demo of concrete, partial screen wall, stair nosing, carpet and walls. We also redid the bathrooms. This project was subcontracted from E-Corp.… Read More
On April 24, 2012 Edstrom Construction, Inc. started construction on this project. It consisted of 5980 lf of 6” water main, 54 Campsite Services, 12 Irrigation Services, 8500 feet of Electrical Conduit connecting new electrical services for each of the campsites. A new well was brought online with a new 15 HP Gould pump. Both… Read More
Edstrom Construction was a subcontracor for E-corp on this project. We added an auditorium to the existing administration building for park visitors. ECI was responsible for all sitework to include; excavation, utilities, concrete & rebar, block, structural steel and some finishes.… Read More
ECI is currently building both single family units and duplexes at Big Bend National Park for Border Patrol Housing. 6 single family homes, each 1580 sq ft, 3 duplexes, each 3300 sq ft. Installation, trenching of all propane and utilities. Self performing all work including, concrete installation. ECI has self performed all construction from site utilities… Read More
Project included the construction of a new masonry building headworks facility. The new headworks facility included upgrades to the treatment plants equipment screens, grit removal system, a septage receiving station, flow meters, primary lift station, chemical metering pumps, and HVAC equipment.… Read More
Edstrom Construction owns and maintains their own crushing facility. Materials are made at one of two gravel pits owned by ECI. Equipment is mobile for certain projects that require large quantities of material. click here for Gravel Price List… Read More